1.
Take a spare M.2 FRU out of its ESD bag.
2.
Open the handle of the M.2 FRU and push the M.2 FRU into the slot of the Avago
SAS3004iMR RAID control card. See (1) in
3.
Close the handle of the M.2 FRU. See (2) in
.
Figure 4-10
Installing an M.2 FRU
----End
4.3.9 Removing the Supercapacitor
Procedure
Step 1
Power off the compute node.
Step 2
Remove the compute node.
Step 3
Place the compute node on the ESD workstation.
Step 4
Remove the cover.
.
Step 5
Determine the position of the supercapacitor.
FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
4 Parts Replacement
Issue 06 (2019-08-10)
Copyright © Huawei Technologies Co., Ltd.
63