4
Parts Replacement
4.1 Obtaining Tools
Ensure that the following tools are available:
l
ESD wrist strap or ESD gloves
l
Protective gloves
l
ESD bags
l
Box cutter
l
M3 Phillips screwdriver
l
Flat-head screwdriver
l
T20 Torx screwdriver
4.2 Replacement Guidelines
4.2.1 System Reliability
The CH121 V5 must meet the following requirements for system reliability:
l
To ensure optimal heat dissipation, ensure that the server is completely filled with
components or filler panels.
l
If the processor socket is not installed with a processor, install a socket cover.
If the CH121 V5 is configured with only one processor, the processor must be installed
in socket CPU 1 and memory modules must be configured for CPU 1.
l
Install air ducts above memory slots.
l
The CMOS battery has sufficient power.
l
Processors 1 and 2 use different heat sinks. The following heat sink configurations are
available:
FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
4 Parts Replacement
Issue 06 (2019-08-10)
Copyright © Huawei Technologies Co., Ltd.
53