Figure 3-5
Installing a filler panel
----End
3.4 Installing a CH121 V5
Procedure
Step 1
Determine the position of the compute node in the chassis.
FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
3 Basic Operations
Issue 06 (2019-08-10)
Copyright © Huawei Technologies Co., Ltd.
13