
FusionModule1000A20 Prefabricated All-in-One Data
Center
Maintenance Guide
4 Parts Replacement
Issue 01 (2019-07-15)
Copyright © Huawei Technologies Co., Ltd.
46
Impact on the System
The device at the rear of the ETH converter is disconnected.
Preparations
Tools: ESD wrist strap, ESD gloves, step ladder, label, marker
Material: ETH converter
Documents: none
Skill requirement: ELV engineer
Procedure
Step 1
Label each cable based on the corresponding ports on the ETH converter.
Step 2
Disconnect cables from the ETH converter.
Step 3
Remove the faulty ETH converter.
Step 4
Install the spare ETH converter in the original position and connect the cables.
----End
4.3.5 Replacing a Camera
Prerequisites
A spare camera of the same model is available and functional.
Impact on the System
Video surveillance stops.
Preparations
Tools: Phillips screwdriver, step ladder, protective gloves
Material: spare camera
Documents: documents delivered with the camera, management system initial configuration
table
Skill requirement: weak-current engineer
Procedure
Step 1
Remove the base, as shown in the right figure. Align the mark on the base with that on the
upper cover. Press the position marked with A to separate the base from the upper cover.