
FusionModule1000A20 Prefabricated All-in-One Data
Center
Maintenance Guide
4 Parts Replacement
Issue 01 (2019-07-15)
Copyright © Huawei Technologies Co., Ltd.
44
Figure 4-13
Installing the Micro SD and SIM card
Step 7
Install the spare ECC800 main control module in the ECC800 subrack and tighten the screws
on both sides of the ECC800 main control module.
Step 8
Connect the communications cables and antennas to the ECC800 main control module.
Step 9
Choose
Maintenance
>
Configuration File
and import the backup configuration file, or set
parameters for the devices that connect to the ECC800 to ensure normal communication.
----End
4.3.2 Replacing an ECC800 PSU
Prerequisites
Do not touch the terminals in the rear of a removed PSU to avoid electric shocks.
Tool: insulation gloves
Materials: a reserved undamaged and undeformed PSU of the appropriate model.
Context
The PSU is hot-swappable.
Procedure
Step 1
Push the locking latch in the upper right corner of the PSU panel leftwards.
Step 2
Pull out the handle of the PSU to remove the PSU from the subrack.
Step 3
Gently push the reserved PSU into the subrack along guide rails, and push the locking latch
rightwards to secure the handle.