lp-445-r4 Rev. 006 Rel. 027 Date 7.21.20
27
All vent pipes must be glued, properly supported, and the exhaust
pitched a minimum of 1/4” per foot back to the boiler to allow
drainage of condensate. When placing support brackets on vent
piping, the first bracket must be within 1 foot of the boiler and the
balance of 4 foot intervals on the vent pipe. Venting must be readily
accessible for visual inspection from the first three feet from the
boiler.
NOTE:
These drawings are meant to demonstrate system venting only.
The installer is responsible for all equipment and detailing required by
local codes.
Ensure the terminations are screened to prevent blockage caused by
debris or birds.
Figure 15 - Unbalanced Venting - Roof Exhaust and Sidewall Intake
An unbalanced vent system can be installed ONLY when the exhaust
is in the vertical position. Failure to do so could result in serious
personal injury or death.
Figure 16 - Roof and Sidewall Venting with Stainless Steel
Take extra precaution to adequately support the weight of vent
pipes terminating through the roof. Failure to properly support roof
terminated vent piping could result in property damage, serious
personal injury, or death due to flue gas leakage.
Содержание MODCON500 FS
Страница 34: ...lp 445 r4 Rev 006 Rel 027 Date 7 21 20 34 Figure 26 Cascade Master and Follower Wiring ...
Страница 61: ...lp 445 r4 Rev 006 Rel 027 Date 7 21 20 61 Figure 34 Water Side Replacement Parts All Models ...
Страница 62: ...lp 445 r4 Rev 006 Rel 027 Date 7 21 20 62 Figure 35 Cabinet Replacement Parts All Models See Table ...
Страница 65: ...lp 445 r4 Rev 006 Rel 027 Date 7 21 20 65 Maintenance Notes ...