13. If removed, install the air baffle.
16. Do one of the following:
• If the server is in tower mode:
Position the tower server for operation.
• If the server is in rack mode:
Install the server on the tray.
17. Connect all necessary external cabling to the expansion board.
For more information on these cabling requirements, see the documentation that ships with the option.
18. Connect all peripheral cables to the server.
19. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
The installation is complete.
Internal USB device option
The server provides one internal USB 2.0 port and one USB 3.0 port. You can use these two ports to install internal USB
devices such as USB flash media devices. These devices are rarely removed and are used for booting up from flash
solutions or for data backup/redundancy.
90
Hardware options installation
Содержание ProLiant ML30 Gen10
Страница 19: ...Four bay LFF hot plug drive numbering Eight bay SFF hot plug drive numbering Component identification 19...
Страница 21: ...Component identification 21...
Страница 75: ...10 Remove the mylar tape 11 Attach the serial port cable clip to the chassis Hardware options installation 75...
Страница 111: ...Heatsink fan cabling PCI fan cabling Cabling 111...
Страница 113: ...Front I O cabling Front USB cabling Cabling 113...