16. Do one of the following:
• If the server is in tower mode:
Position the tower server for operation.
• If the server is in rack mode:
Install the server on the tray.
17. Connect all peripheral cables to the server.
18. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
The installation is complete.
To configure arrays, see the HPE Smart Array SR Gen10 Configuration Guide at the
Installing an LFF hot-plug drive
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays are
populated with either a component or a blank.
Procedure
2. Remove the drive blank.
3. Prepare the drive.
52
Hardware options installation
Содержание ProLiant ML30 Gen10
Страница 19: ...Four bay LFF hot plug drive numbering Eight bay SFF hot plug drive numbering Component identification 19...
Страница 21: ...Component identification 21...
Страница 75: ...10 Remove the mylar tape 11 Attach the serial port cable clip to the chassis Hardware options installation 75...
Страница 111: ...Heatsink fan cabling PCI fan cabling Cabling 111...
Страница 113: ...Front I O cabling Front USB cabling Cabling 113...