4. Do one of the following:
• If the server is in tower mode:
Position the tower server for operation.
• If the server is in rack mode:
Install the server on the tray.
5. Connect all peripheral cables to the server.
6. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
Remove the PCI slot blank retainer
Procedure
1. Remove the PCI slot blank retainer:
a. Loosen the retainer thumbscrew.
b. Slide the retainer up, then remove it from the chassis.
30
Operations
Содержание ProLiant ML30 Gen10
Страница 19: ...Four bay LFF hot plug drive numbering Eight bay SFF hot plug drive numbering Component identification 19...
Страница 21: ...Component identification 21...
Страница 75: ...10 Remove the mylar tape 11 Attach the serial port cable clip to the chassis Hardware options installation 75...
Страница 111: ...Heatsink fan cabling PCI fan cabling Cabling 111...
Страница 113: ...Front I O cabling Front USB cabling Cabling 113...