26
Chapter 4
Procedures
STEP 3
Install Sheet Metal Nuts in front columns.
In the middle hole of the EIA unit located in Step 1,
place sheet metal nuts on the front columns as
shown. The location is an example.
STEP 4
Install the Monitor Base.
Standing in front of the rack and holding the front of
the Monitor Base, move it to the rear. The pins point-
ing in on the Rear Brackets fit into the channels cut
into the back of the Monitor Base. Align the front of
the Monitor Base at the EIA location.
Installing Monitor Shelf
This Monitor Rack Mount Kit accomodates most 15”-
19” HP monitors. This kit normally is installed last in a
rack configuration. For convenience and safety install
other components and keyboard kit before installing
this Monitor Rack Mount Kit. This kit requires 11 EIA
units in your HP rack.
Contents
2
Rear Brackets
6
Sheet Metal Nuts
1
Monitor Base
6
Decorative Screws
2
Torx 25 Screws with Lock
2
Decorative Panels
4
Clamp Assemblies
Tools Needed:
Torx 25 Driver
NOTE: Extend the rack’s four leveling feet
before installing components in the rack.
STEP 1
Choose EIA location for the Monitor Base.
Determine where you want the bottom of the Monitor
Base. To place the monitor at the top of a 1.96m
E-Series rack, use EIA 30.
STEP 2
Position and attach Rear Brackets to rear
columns.
Position the bottom of the Rear Brackets on the rear
columns at the desired EIA location. Install with two
non-decorative Torx 25 screws.
EIA location of
MonitorBase bottom
0
31
30
29
28
27
26
30
31
32
29
30
31
3
30
31
EIA location of
Monitor Base bottom