Installing mezzanine card options
Installing mezzanine card options
Mezzanine options are classified as Type C and Type D mezzanine cards. The type of mezzanine card determines where the card can be
installed in the compute module. Some mezzanine cards require an interconnect module to be installed in the associated ICM bay in the
rear of the frame. The location of the mezzanine card determines the location of the interconnect modules.
Review the mezzanine card mapping information in the HPE Synergy Configuration and Compatibility Guide
(https://www.hpe.com/info/synergy-docs
https://www.hpe.com/info/synergy-docs).
For more information about the association between the mezzanine bay and the interconnect bays, see the HPE Synergy 12000 Frame
Setup and Installation Guide (https://www.hpe.com/info/synergy-docs
https://www.hpe.com/info/synergy-docs).
Procedure
Procedure
1. Power down the compute module.
3. Place the compute module on a flat, level work surface.
5. Locate the appropriate mezzanine connector.
To locate the connector, see System board components.
6. If installed, remove the mezzanine connector cover.
7. Install the mezzanine card.
Press firmly on the PRESS HERE
PRESS HERE label above the mezzanine connector to seat the card.
When a GPU mezzanine adapter is installed in the compute module, an additional mounting bracket is required.
9. Install the compute module.
10. Power up the compute module.
Installing mezzanine card options
57
Содержание Synergy 480 Gen10
Страница 6: ...Component identification Component identification 6 ...
Страница 10: ...Front panel LEDs and buttons 10 ...
Страница 15: ...Smart Carrier NVMe SCN drive LED definitions 15 ...
Страница 32: ...Operations Operations 32 ...
Страница 45: ...Setup Setup 45 ...
Страница 90: ...HPE Trusted Platform Module 2 0 Gen10 option HPE Trusted Platform Module 2 0 Gen10 option 90 ...
Страница 93: ...Installing and enabling the HPE TPM 2 0 Gen10 option Installing and enabling the HPE TPM 2 0 Gen10 option 93 ...
Страница 94: ...Installing the Trusted Platform Module board Installing the Trusted Platform Module board 94 ...
Страница 97: ...4 Proceed to Preparing the compute module for operation Installing the TPM board and cover 97 ...
Страница 103: ...Cabling Cabling 103 ...
Страница 105: ...Energy pack option cabling Energy pack option cabling 105 ...
Страница 108: ...Electrostatic discharge Electrostatic discharge 108 ...
Страница 111: ...Specifications Specifications 111 ...
Страница 118: ...Support and other resources Support and other resources 118 ...