
8. Install any components removed to access the DIMM slots.
10. Slide or install the compute module into the frame.
11. If removed, reconnect all power cables.
12. Power up the compute module.
13. Configure the server for Intel Optane persistent memory for HPE.
More information
More information
Persistent memory module population information
Configuring the compute module for Intel Optane persistent memory 100 series for HPE
Installing persistent memory modules
82
Содержание Synergy 480 Gen10
Страница 6: ...Component identification Component identification 6 ...
Страница 10: ...Front panel LEDs and buttons 10 ...
Страница 15: ...Smart Carrier NVMe SCN drive LED definitions 15 ...
Страница 32: ...Operations Operations 32 ...
Страница 45: ...Setup Setup 45 ...
Страница 90: ...HPE Trusted Platform Module 2 0 Gen10 option HPE Trusted Platform Module 2 0 Gen10 option 90 ...
Страница 93: ...Installing and enabling the HPE TPM 2 0 Gen10 option Installing and enabling the HPE TPM 2 0 Gen10 option 93 ...
Страница 94: ...Installing the Trusted Platform Module board Installing the Trusted Platform Module board 94 ...
Страница 97: ...4 Proceed to Preparing the compute module for operation Installing the TPM board and cover 97 ...
Страница 103: ...Cabling Cabling 103 ...
Страница 105: ...Energy pack option cabling Energy pack option cabling 105 ...
Страница 108: ...Electrostatic discharge Electrostatic discharge 108 ...
Страница 111: ...Specifications Specifications 111 ...
Страница 118: ...Support and other resources Support and other resources 118 ...