Hardware options installation 23
11.
Connect the other end of the SATA cable to the system board.
12.
Fully insert the drive carrier into the media bay until the screw holes line up with the holes in the chassis,
and then secure the drive cage, using the two M3 screws from the option kit.
13.
Install the front bezel (on page
14
).
14.
Install the access panel (on page
14
).
15.
Return the server to an upright position.
16.
Connect the power cord to the server.
17.
Connect the power cord to the power source.
18.
Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.
Содержание ProLiant ML10
Страница 5: ...Contents 5 Documentation feedback 73 Index 74 ...
Страница 11: ...Component identification 11 Fan locations Item Description 1 Rear system fan 2 Processor heatsink fan assembly ...
Страница 45: ...Cabling 45 Ambient temperature sensor cabling Fan cabling System fan ...
Страница 68: ...Support and other resources 68 ...
Страница 69: ...Support and other resources 69 ...