Hardware options installation 65
7.
Install the expansion board.
8.
Align the PCI riser board with the corresponding connector on the system board, and then press
down the riser cage.
9.
Tighten the two screws to secure the cage.
10.
Install the access panel (on page
11.
Install the server into the rack.
12.
Power up the server (on page
Expansion board options
The server has both full-height/half-length and low-profile expansion slots for controller option installation.
For more information about product features, specifications, options, configurations, and compatibility,
see the product QuickSpecs on the Hewlett Packard Enterprise website (
CAUTION:
To prevent damage to the server or expansion boards, power down the server,
and disconnect all power cords before removing or installing the PCI riser cage.
Содержание ProLiant DL60 Gen9
Страница 14: ...Component identification 14 Fan locations ...
Страница 22: ...Operations 22 o Secondary PCI riser cage o PCI blank ...
Страница 86: ...Cabling 86 FBWC module slot 1 cabling FBWC module slot 2 cabling ...
Страница 87: ...Cabling 87 FBWC module slot 3 cabling Smart Storage battery cabling ...
Страница 117: ...Support and other resources 117 ...
Страница 118: ...Support and other resources 118 ...