Operations 21
To install the component:
1.
Install the air baffle.
2.
Install the access panel (on page
3.
Do one of the following:
o
Slide the server into the rack.
o
Install the server into the rack.
4.
Power up the server (on page
Remove the PCI riser cage
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION:
To prevent damage to the server or expansion boards, power down the server,
and disconnect all power cords before removing or installing the PCI riser cage.
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
o
Extend the server from the rack (on page
o
Remove the server from the rack (on page
4.
Remove the access panel (on page
5.
Disconnect all cables connected to existing expansion boards.
6.
Remove the secondary PCI riser cage or PCI blank.
Содержание ProLiant DL60 Gen9
Страница 14: ...Component identification 14 Fan locations ...
Страница 22: ...Operations 22 o Secondary PCI riser cage o PCI blank ...
Страница 86: ...Cabling 86 FBWC module slot 1 cabling FBWC module slot 2 cabling ...
Страница 87: ...Cabling 87 FBWC module slot 3 cabling Smart Storage battery cabling ...
Страница 117: ...Support and other resources 117 ...
Страница 118: ...Support and other resources 118 ...