Hardware options installation 37
Drive installation guidelines
When adding drives to the server, observe the following general guidelines:
•
The system automatically sets all device numbers.
•
Populate drive bays, based on the drive numbering sequence. Start from the drive bay with the
lowest device number ("
•
All drives grouped into the same drive array must meet the following criteria:
o
They must be either all SAS or all SATA.
o
They must be either all hard drives or all solid state drives.
o
Drives should be the same capacity to provide the greatest storage space efficiency when drives
are grouped together into the same drive array.
Installing a non-hot-plug drive
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server
unless all bays are populated with either a component or a blank.
To install the component:
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
If installed, remove the security bezel ("
Remove the security bezel (optional)
" on page
4.
Remove the drive carrier.
5.
Remove the two metal brackets from the drive carrier.
Содержание ProLiant DL60 Gen9
Страница 14: ...Component identification 14 Fan locations ...
Страница 22: ...Operations 22 o Secondary PCI riser cage o PCI blank ...
Страница 86: ...Cabling 86 FBWC module slot 1 cabling FBWC module slot 2 cabling ...
Страница 87: ...Cabling 87 FBWC module slot 3 cabling Smart Storage battery cabling ...
Страница 117: ...Support and other resources 117 ...
Страница 118: ...Support and other resources 118 ...