Hardware options installation 44
13.
Route the Mini-SAS cables through the clip and connect the connectors to the drive backplane.
o
H240 Host Bus Adapter to the 4 LFF drive backplane
o
P440 Smart Array Controller to the 4 LFF drive backplane
14.
Connect the rest of the drive cables required in this drive configuration. For more information, see
"Storage cabling (on page
)."
15.
Install the access panel (on page
16.
Install the server into the rack.
17.
Power up the server (on page
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server
unless all bays are populated with either a component or a blank.
18.
Install the drives.
Содержание ProLiant DL60 Gen9
Страница 14: ...Component identification 14 Fan locations ...
Страница 22: ...Operations 22 o Secondary PCI riser cage o PCI blank ...
Страница 86: ...Cabling 86 FBWC module slot 1 cabling FBWC module slot 2 cabling ...
Страница 87: ...Cabling 87 FBWC module slot 3 cabling Smart Storage battery cabling ...
Страница 117: ...Support and other resources 117 ...
Страница 118: ...Support and other resources 118 ...