Restarting a cluster node causes all
fi
le shares served by that node to fail over to the other nodes in the
cluster based on the failover policy in place. Until the failover process completes, any currently executing
read and write operations will fail. Other node(s) in the cluster will be placed under a heavier load by
the extra work until the restarted node comes up and the resources are moved back.
Shutting down one cluster node
CAUTION:
Shutting down a cluster node must be done only after con
fi
rming that the other node(s) in the cluster
are functioning normally. Adequate warning should be given to users connected to resources of the
node being shutdown.
Shutting down a cluster node causes
fi
le shares served by that node to fail over to the other node(s). This
causes any currently executing client read and write operations to fail until the cluster failover process
completes. The other node(s) are placed under a heavier load by the extra work until the second node
is powered up and rejoins the cluster.
Powering down the cluster
The power down process for the storage server cluster is similar to the process for a single node, but with
the cluster, extra care must be taken with the storage subsystem and the sequence of the shutdown.
The power down process is divided into two main steps:
1.
Shutting down the cluster nodes
2.
Removing power from the cluster nodes
The sequence of these steps is critical. The devices must be shut down before the storage subsystem.
Improperly shutting down the nodes and the storage subsystem causes corruption and loss of data.
CAUTION:
Before powering down the cluster nodes, follow the proper shutdown procedure as previously illustrated.
See “
Shutting down one cluster node
.” Only one cluster node should be shut down at a time.
CAUTION:
The cluster nodes should never be powered on when the storage subsystem is not available.
Powering up the cluster
The power up process for the storage server cluster is more complex than it is for a single node because
extra care must be taken with the storage subsystem.
The sequence of the power up steps is critical. Improper power up procedures can cause corruption
and loss of data.
CAUTION:
Do not power up the cluster nodes without
fi
rst powering up the storage subsystem, and verifying it
is operating normally.
Nodes should be powered up separately allowing one node to form the cluster prior to powering up the
additional node(s). To power up the cluster nodes:
HP ProLiant DL380 G5 Storage Server
139
Содержание ProLiant DL380 G5 DPSS
Страница 24: ...24 The HP storage server solution ...
Страница 96: ...96 Print services ...
Страница 152: ...152 Network adapter teaming ...
Страница 164: ...164 Regulatory compliance and safety ...