15. If removed, install the security bezel
.
Installing a FlexibleLOM riser cage assembly
For more information on the riser board slot specifications, see "
PCIe riser board slot definitions
."
For more information about the integrated storage controller and its features, select the relevant user
documentation on the
Hewlett Packard Enterprise website
Procedure
1.
2.
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Do one of the following:
•
Extend the server from the rack
•
Remove the server from the rack
.
5.
.
6.
Remove the existing PCI riser cage
7.
Using a T-10 screwdriver, remove the blank from the FlexibleLOM slot of the riser cage.
8.
Install the FlexibleLOM adapter:
a.
Firmly seat the FlexibleLOM adapter in the slot.
b.
Secure the FlexibleLOM adapter with a T-10 screw.
9.
72
Installing a FlexibleLOM riser cage assembly
Содержание ProLiant DL20 Gen9
Страница 16: ... Two bay LFF hot plug drive model Four bay SFF hot plug drive model 16 Component identification ...
Страница 88: ... Four bay SFF hot plug configuration Two bay LFF non hot plug configuration 88 Cabling ...
Страница 90: ...Optical drive cabling Two bay LFF configuration Four bay SFF configuration 90 Optical drive cabling ...
Страница 120: ...120 Support and other resources ...