3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Do one of the following:
•
Extend the server from the rack
•
Remove the server from the rack
.
5.
.
6.
Disconnect the existing Mini-SAS cables from the system board and the drive backplane.
7.
8.
Remove the blank from slot 2 of the riser cage.
9.
Install the Smart Array controller.
a.
If installed, remove the air scoop from the controller.
42
Hardware options installation
Содержание ProLiant DL20 Gen9
Страница 16: ... Two bay LFF hot plug drive model Four bay SFF hot plug drive model 16 Component identification ...
Страница 88: ... Four bay SFF hot plug configuration Two bay LFF non hot plug configuration 88 Cabling ...
Страница 90: ...Optical drive cabling Two bay LFF configuration Four bay SFF configuration 90 Optical drive cabling ...