1
2
2
9.
Install the M.2 SSD enablement board into the PCI riser cage and then connect the SATA cable to the
enablement board.
• Slot 1
• Slot 2
10. Install the PCI riser cage
11.
Connect the SATA cable to the SATA connector on the system board.
12.
Based on the riser cage configuration, route the M.2 SSD SATA cable in the following ways:
• Two-bay LFF configuration
62
Hardware options installation
Содержание ProLiant DL20 Gen9
Страница 16: ... Two bay LFF hot plug drive model Four bay SFF hot plug drive model 16 Component identification ...
Страница 88: ... Four bay SFF hot plug configuration Two bay LFF non hot plug configuration 88 Cabling ...
Страница 90: ...Optical drive cabling Two bay LFF configuration Four bay SFF configuration 90 Optical drive cabling ...
Страница 120: ...120 Support and other resources ...