Retain the cage for future use.
Installing the PCI riser cage
CAUTION:
To prevent damage to the server or expansion boards, power down the server, and disconnect all power
cords before removing or installing the PCI riser cage.
Procedure
1.
If cabled expansion boards are installed on the PCI riser cage, connect all necessary internal cabling to
the expansion boards.
For more information on these cabling requirements, see the documentation that ships with the option.
2.
Align the riser board with the corresponding connectors on the system board, then press down on the PCI
riser cage.
4.
Do one of the following:
Installing the PCI riser cage
25
Содержание ProLiant DL20 Gen9
Страница 16: ... Two bay LFF hot plug drive model Four bay SFF hot plug drive model 16 Component identification ...
Страница 88: ... Four bay SFF hot plug configuration Two bay LFF non hot plug configuration 88 Cabling ...
Страница 90: ...Optical drive cabling Two bay LFF configuration Four bay SFF configuration 90 Optical drive cabling ...
Страница 120: ...120 Support and other resources ...