
3 Operation
14
3.3
Shutting Down
3.3.1
For Shut Down within 7 Days
1.
Turn ON the maintenance switch.
2.
Turn OFF the POWER switch.
3.3.2
For Shut Down over 7 Days
1.
Close all the valves (V-1 to V-4).
2.
Turn ON the maintenance switch.
3.
Turn OFF the POWER switch.
4.
Clean the overflow tank and measuring tank.
Reference
"5.6 Maintenance - Action" (page 56)
5.
Clean the cell of control unit.
Reference
"2.4 Piping Configuration" (page 8)
3.4
Restarting Operation
3.4.1
For Shut Down within 7 Days
Follow the procedure of "3.2 Starting Operation" (page 13).
3.4.2
For Shut Down over 7 Days
1.
Follow the procedure of "3.1 Preparation for Operation" (page 12).
2.
Follow the procedure of "3.2 Starting Operation" (page 13).