
2 Installation
7
2.3
Installation Method
Assemble the base, measuring tank, overflow tank and control unit as guided in the
working instruction separately supplied.
Secure the base with the reference bolts.
Note
The pole stand and the base illustrated are typical examples. Appearance and size may vary
depending on specifications.
さ
Roof (optional)
Control unit
Overflow tank
Analyzer unit
Measuring tank
Wing nuts (4)
Base
Secure with M8 bolts (4)
[Unit: mm]