28
MAN0530 Issue 09 October 03
Searchline Excel
2104M0506
3.6
INSTALLATION PROCEDURE
3.6.1 General
Searchline Excel is designed to allow installation and alignment to be performed by a single
technician.
The installation procedure is split into mechanical installation and electrical installation. Each
unit needs to be mounted to a supporting structure before making the electrical connections.
3.6.2 Mechanical Installation
The mechanical installation procedure applies to both the Receiver and the Transmitter.
(1)
Ensure that the gas detector equipment supplied is compatible with the required application
(i.e. short, medium or long range).
(2)
Fit the mounting bracket and isolation kit to the mounting plate for the unit as shown:
Mounting plate
Mounting bracket
Isolation kit
8?
(3)
Fit the mounting plate to the supporting structure.
The plate can be fitted in one of the following ways:
a.
With bolts directly to a flat surface.
b.
With U-bolts (2 off) to a single 150mm diameter pipe or pole.
c.
With U-bolts (4 off) to two 55mm diameter pipes or poles, 166mm apart.
Identify the required mounting holes from the following drawing and table:
3. INSTALLATION AND OPERATION
Содержание Searchline Excel Cross-Duct
Страница 1: ...Searchline Excel Infrared Gas Detectors Open Path and Cross duct Technical Handbook ...
Страница 90: ...90 MAN0530 Issue 09 October 03 Searchline Excel 2104M0506 8 CERTIFICATION 8 2 5 System Diagram ...
Страница 93: ...93 MAN0530 Issue 09 October 03 Searchline Excel 2104M0506 8 CERTIFICATION 8 3 3 Certification Label ...
Страница 99: ...99 MAN0530 Issue 09 October 03 Searchline Excel 2104M0506 8 CERTIFICATION ...
Страница 100: ...100 MAN0530 Issue 09 October 03 Searchline Excel 2104M0506 8 CERTIFICATION With DX100 M Termination Unit ...
Страница 124: ......