10-14
CAM PULLEY/CRANKSHAFT/PISTON/ CYLINDER BLOCK
HRR216VKA
6. COMPONENT INSPECTION
CAM PULLEY HEIGHT INSPECTION
CAM PULLEY I.D. (BEARING) INSPECTION
CAM PULLEY DECOMPRESSOR INSPECTION
Inspect the decompressor return spring for proper strength.
Check the decompressor arm and pin for proper movement and
wear.
CAM PULLEY SHAFT O.D. INSPECTION
Standard
Service limit
37.394 mm (1.4722 in)
37.369 mm (1.4712 in)
Standard
Service limit
10.027 mm (0.3948 in)
10.075 mm (0.3967 in)
Standard
Service limit
9.987 mm (0.3932 in)
9.920 mm (0.3906 in)
SPRING
ARM
PIN
Содержание HRR216VKA K10
Страница 5: ...INTRODUCTION HRR216VKA iv NOTES...
Страница 11: ...1 6 SPECIFICATIONS HRR216VKA 3 WIRING DIAGRAM SPARK PLUG IGNITION COIL ENGINE STOP SWITCH NORMALLY CLOSED...
Страница 71: ...6 2 MUFFLER HRR216VKA NOTES...
Страница 75: ...7 4 RECOIL STARTER HRR216VKA NOTES...
Страница 103: ...8 28 FUEL SYSTEM HRR216VKA NOTES...
Страница 161: ...12 8 CLIP DIRECTOR MOWER DECK WHEELS HRR216VKA NOTES...