page 24 Compass
™
Stainer Operator’s Manual
Load a third rack in the LOAD station and press RUN.
Pause or Stop a Run of Multiple Racks
To Pause or Stop the run, the user presses the STOP key and follows the prompt as displayed: press
RUN to resume the run; press STOP to cancel the run.
Note: Cancel Run will cancel ALL racks in progress!!
R: S: ST: PT:
1 03 00:51 00:28:47
2 __ __:__ _WAITING
_ __ __:__ __:__:__
_ __ __:__ __:__:__
RUN: ANOTHER RACK
STOP: PAUSE / CANCEL
R: S: ST: PT:
1 04 06:26 00:25:55
2 01 00:46 00:43:20
_ __ __:__ __:__:__
_ __ __:__ __:__:__
RUN: ANOTHER RACK
STOP: PAUSE / CANCEL
Second rack waiting
Second rack in progress
PGM 1 IS RUNNING
YOU MUST SELECT THE
SAME PROGRAM.
ENTER: RUN SAME PGM.
STOP: DO NOT RUN.
R: S: ST: PT:
1 05 04:21 00:23:51
2 03 00:10 00:41:36
3 01 00:58 00:57:21
_ __ __:__ __:__:__
RUN: ANOTHER RACK
STOP: PAUSE / CANCEL
Same program message is
displayed. RUN to continue
Third rack in progress
***** PAUSE! *****
RUN: RESUME RUN.
STOP: CANCEL RUN.