26
ACCESSORIES
PRO 60 (110) HP / HPP 700/1.5
Fig. 12.
Mounting the crane arm
Then, mount the gas spring unit between the crane arm and the crane base as
shown in Fig. 13. Place the unit in a proper arm socket (
1
) to set such a force that will
balance the weight of the machine. Insert the piston rod into the base socket on the
required height (
2
). Hang the machine with the chain on the arm end (
3
), and lock
the chain with the locking plate (
4
), 6.4 mm washer (
5
), and M6x20 handlever (
6
). To
set a different force or height, remove the machine with the chain and locate the gas
spring unit in an adjacent socket of either comb
1
or
2
.
PRO 60 (110) HP / HPP 700/1.5
Fig. 11.
Mounting the crane base and the supports
Lock the supports in this position by placing the pins in location
1
from Fig.
12. To
join the crane arm to the crane base, put two 44 mm washers (
2
) between the base
and
arm,
and
insert the pivot pin (
3
). Next, at both sides put 13 mm round washers (
4
),
and place the 9 mm clips (
5
) into the grooves of the pivot pin.
3
4
1
2
1
2
3
4
5
PRO 60 (110) HP / HPP 700/1.5
Fig. 11.
Mounting the crane base and the supports
Lock the supports in this position by placing the pins in location
1
from Fig.
12. To
join the crane arm to the crane base, put two 44 mm washers (
2
) between the base
and
arm,
and
insert the pivot pin (
3
). Next, at both sides put 13 mm round washers (
4
),
and place the 9 mm clips (
5
) into the grooves of the pivot pin.
3
4
1
2
1
2
3
4
5
Lock the supports in this position by placing the pins in location 1 from Fig. 12. To join the
crane arm to the crane base, put two 44 mm washers (2) between the base and arm, and insert
the pivot pin (3). Next, at both sides put 13 mm round washers (4), and place the 9 mm clips (5)
into the grooves of the pivot pin.
Then, mount the gas spring unit between the crane arm and the crane base as shown in Fig.
13. Place the unit in a proper arm socket (1) to set such a force that will balance the weight of
the machine. Insert the piston rod into the base socket on the required height (2). Hang the
machine with the chain on the arm end (3), and lock the chain with the locking plate (4), 6.4 mm
washer (5), and M6x20 handlever (6). To set a different force or height, remove the machine
with the chain and locate the gas spring unit in an adjacent socket of either comb 1 or 2.