79
Appendix 4:
Pre-Op Checklist
PRE-OP CHECK LIST
Mobile Spare Parts and Tool System
Hog Head & Spray Bars
F
Mobile Spare Parts System Complete
F
Caster Wheels In Good Condition
F
Mobile Tool System Complete
F
Spray Bar & Nozzles Correct
F
Nozzles Grade 4 Or Better
Fluid Levels
F
Spray Bar Cover In Place
F
Power System Fluid Levels
F
Swivel Seal OK
F
Hydraulic Brake Reservoir Fluid Level
F
Dirt Shield OK
F
Clean Water Tank Level
F
Swivel Nut Tight
F
No Loose Or Damaged Components
Grease Points
F
Wear Brush Properly Adjusted & Clamp Tight
F
Thru-Shaft Pump Bearings
F
Standoff Height Set
F
Caster Wheel Bearings
F
UHP System Purged If Necessary
F
Caster Swivels
Operational Testing
Hoses & Fittings
F
Power System Operating Properly
F
UHP Hoses Connected & Torqued To Specifications
F
All Controls Working
F
Vacuum Hoses Connected Properly
F
Engage/Disengage High Pressure - Verify Valve Operation
F
All Hoses Inspected For Chaffing Or Damage
F
High Pressure & Nozzle Spray Test Completed
F
Anti-Chaffing Added If Necessary
F
UHP Pressure Set
F
Spray Bar Rotation Speed Set
F
Verify No UHP Hose Fitting Or Component Leaks
F
Verify No Vacuum Hose Or Hose Fitting Leaks
Содержание HT1000SR
Страница 2: ...2...
Страница 6: ...6 NOTES...
Страница 8: ...8 NOTES...
Страница 18: ...18 NOTES...
Страница 34: ...34 NOTES...
Страница 76: ...76 NOTES...
Страница 77: ...77 Appendix 3 Tools Spare Parts Mobile Tool System...
Страница 80: ...80 NOTES...
Страница 86: ...86 NOTES...
Страница 89: ......