A
Server replacement procedures
The replacement of the server as part of a field service process can take
several forms depending on how the system was originally deployed. The
typical field deployment scenarios documented for service replacement
include:
• Single stand-alone server using an embedded SMU for management
• Single stand-alone server using an external SMU for management
• Two-node cluster using an external SMU for management-replacing only
one node
• Two-node cluster using an external SMU for management-replacing both
nodes
Important:
This document does not treat migration scenarios between
different configurations at the time of replacement.
□
Replacement procedure overview
□
Replacing a single server with an embedded SMU
□
Replacing a single server with an external SMU
□
Replacing a node within a cluster
□
Replacing all servers within a cluster
88
Server replacement procedures
Hitachi NAS Platform 3080/3090 G2 Hardware Reference Guide
Содержание 3080 G2
Страница 1: ...Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference Release 12 2 MK 92HNAS017 05 ...
Страница 7: ...7 Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...
Страница 19: ...About this manual 19 Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...
Страница 28: ...28 Mandatory regulations Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...
Страница 29: ...Mandatory regulations 29 Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...
Страница 35: ...System overview 35 Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...
Страница 59: ...Hitachi NAS Platform server components 59 Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...
Страница 79: ...Replacing server components 79 Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...
Страница 127: ...Parts list for 3080 3090 G2 servers 127 Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...
Страница 128: ...Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...