Service Manual
DS 350 GM
Rev A 05/01/01 // SB
190113_A
42
5.2
PROCEDURE 2. EPROM LOCATION AND INSTALLATION
TLK
DAT
A
SYS
TEM
x
Ensure the notch is in the correct direction.
x
The DATA and TLK EPROMs fill the bottom of the socket as shown by the arrows.
x
Place EPROMs in the correct EPROM socket as shown.
SYSTEM
DATA
TLK
38 Years Specializing
in Crane Electronic Repair & Parts Sales
Call Us. We are glad to help
Bode Technical Services Inc
Email: [email protected]
Phone No.: +1.303.433.8878