Troubleshooting
28/36
Slot PLC NPLC-C100 | Hardware Installation
DOC120112UM02EN | Revision 2 | English | 2014-01 | Released | Public
© Hilscher, 2009-2014
8 Troubleshooting
General
Check, if the requirements for slot PLC operation are fulfilled.
Further information to this you find in section
System Requirements
on
page 15.
Cable
Check that the pin assignment of the used cable is correct.
Configuration
Check the configuration in the Master and the Slave device. The
configuration has to match.