Preventive Maintenance
89
4
Adjust the maximum range calibration.
a
Select MAX to open the Proportional valve.
b
Turn the P.V.GAIN potentiometer (P2, AVM 3-2) until screen pointer shows 97.
c
Select MAX twice to record the value.
5
Measure the gas flow at the drive gas outlet of the docking station.
a
Verify that the flow is at least 75 (–5) l/min
b
Select MIN to close the proportional valve.
c
If the gas flow was within specification, skip the steps 14 and 15 and perform step 16. If the
flow rate was out of specification, go to step 14.
6
High-pressure regulator adjustment.
a
Remove the Driving gas pressure source (AIR or O
2
).
b
Disconnect the red plug of the test port on top of the pressure regulator for the driving gas.
Fig. 40 Pressure Regulator for the Driving Gas with Test Port
c
Attach a pressure gauge to the test port.
d
Reconnect the Driving gas pressure source (AIR or O
2
).
e
Adjust the high pressure regulator by loosing the locking nut on the regulator and turning the
adjustment screw until 200 ± 0.05 kPa (2 ± 0.05 bar; 29 ± 1 PSI) is displayed on the pressure
gauge. Retighten the locking nut.
f
Remove the Driving gas pressure source (AIR or O
2
).
Test Port
Содержание Modular+
Страница 1: ...HEYER Modular Anesthesia System Service Manual Rev 2 1 0 Software version Service software 1 8...
Страница 12: ...Theory of Operation 12 This page intentionally left blank...
Страница 26: ...Repair Information 26 2 14Ventilator pneumatic Fig 6 Ventilator pneumatic...
Страница 90: ...Preventive Maintenance 90...
Страница 98: ...Preventive Maintenance 98 Fig 45 How to measure the voltages U1 and U2...
Страница 102: ...Preventive Maintenance 102 This page intentionally left blank...
Страница 112: ...Order Information 112 034 2950 Silicone tube 6 x 2 for suction 323 0362 Tube cable holder for holding device...
Страница 113: ...Order Information 113 This page intentionally left blank...