![Heyer Modular+ Скачать руководство пользователя страница 78](http://html1.mh-extra.com/html/heyer/modular/modular_service-manual_2128284078.webp)
Preventive Maintenance
78
5
Conduct Power control test (Skip to step 5-e if already in the Test menu.)
a
Select the Select the keys.
i)
SET
ii)
OPT.
iii)
iv)
OK
b
Select KEYCODE to enter the diagnostic screens.
c
Enter a valid key code to invoke the service software.
d
Advance from this window to the main menu by pressing ENTER. Select TEST MENU.
e
Select MISC.
f
Unplug the AC mains cable and verify the AC-OK indicator illuminates.
g
Plug in the AC and verify the BATT (charging) indicator illuminates.
h
Select QUIT to return to the test menu.
Fig. 33 Power and Heater Control screen
Содержание Modular+
Страница 1: ...HEYER Modular Anesthesia System Service Manual Rev 2 1 0 Software version Service software 1 8...
Страница 12: ...Theory of Operation 12 This page intentionally left blank...
Страница 26: ...Repair Information 26 2 14Ventilator pneumatic Fig 6 Ventilator pneumatic...
Страница 90: ...Preventive Maintenance 90...
Страница 98: ...Preventive Maintenance 98 Fig 45 How to measure the voltages U1 and U2...
Страница 102: ...Preventive Maintenance 102 This page intentionally left blank...
Страница 112: ...Order Information 112 034 2950 Silicone tube 6 x 2 for suction 323 0362 Tube cable holder for holding device...
Страница 113: ...Order Information 113 This page intentionally left blank...