Preventive Maintenance
77
m Select M1-M4
n
Activate the MV1 valve by pressing its label (shown on screen). Verify gas flow at the docking
station’s Diaphragm valve connection.
o
Activate the MV3 valve. Verify gas flow at the docking station’s decoupling Valve connection.
p
Activate the MV2 and MV4 valves at the same time. Verify gas flow at the docking station’s
expiratory valve connection.
q
Select QUIT to return to the Test menu.
r
Insert the Patient Module.
Fig. 32 Docking Station valve connectors
Decoupling
Valve
Bellows
Valve
Expiratory
Valve
Содержание Modular+
Страница 1: ...HEYER Modular Anesthesia System Service Manual Rev 2 1 0 Software version Service software 1 8...
Страница 12: ...Theory of Operation 12 This page intentionally left blank...
Страница 26: ...Repair Information 26 2 14Ventilator pneumatic Fig 6 Ventilator pneumatic...
Страница 90: ...Preventive Maintenance 90...
Страница 98: ...Preventive Maintenance 98 Fig 45 How to measure the voltages U1 and U2...
Страница 102: ...Preventive Maintenance 102 This page intentionally left blank...
Страница 112: ...Order Information 112 034 2950 Silicone tube 6 x 2 for suction 323 0362 Tube cable holder for holding device...
Страница 113: ...Order Information 113 This page intentionally left blank...