![Heyer Modular+ Скачать руководство пользователя страница 60](http://html1.mh-extra.com/html/heyer/modular/modular_service-manual_2128284060.webp)
Preventive Maintenance
60
15 Reassemble the patient module and install back into the docking station.
16 Turn off the power switch.
17 Verify O
2
, N
2
O and AIR tank check valves. *
a
Connect and open a full gas tank on each yoke
b
Withdraw the gas connecting coupling from the supply outlet.
c
Verify the check valves prevent gas from escaping through the open supply outlets.
d
Verify there is no external damage to the gas connecting coupling
18 Verify O
2
, N
2
O and AIR supply check valves.
a
Remove the tanks and reconnect the gas connecting couplings to the supply outlets.
b
Verify the check valves prevent gas from escaping through the open tanks yokes.
c
Verify there is no external damage to the gas tank or yoke pins.
* Subject of configuration
Содержание Modular+
Страница 1: ...HEYER Modular Anesthesia System Service Manual Rev 2 1 0 Software version Service software 1 8...
Страница 12: ...Theory of Operation 12 This page intentionally left blank...
Страница 26: ...Repair Information 26 2 14Ventilator pneumatic Fig 6 Ventilator pneumatic...
Страница 90: ...Preventive Maintenance 90...
Страница 98: ...Preventive Maintenance 98 Fig 45 How to measure the voltages U1 and U2...
Страница 102: ...Preventive Maintenance 102 This page intentionally left blank...
Страница 112: ...Order Information 112 034 2950 Silicone tube 6 x 2 for suction 323 0362 Tube cable holder for holding device...
Страница 113: ...Order Information 113 This page intentionally left blank...