Hwang Sun Enterprise Co., Ltd.
Edition 2012/06
12
2-6 NORMAL OPERATION PROCEDURE
2-6-1 PROCEDURE OF TURNING ON MACHINE
1.
TURN ON THE EXTERNAL POWER
SUPPLY.
2.
Turn on the power switch on control panel.
(“ON” position)
3.
Check the hot melt adhesive inside tank is
enough or not, if necessary, please load enough
adhesive into tank.
4.
Check all the temperature on temperature
controller is correct. If they are not the required
temperature, please re-set the temperature.
5. Turn on the motor by pressing the “START”
button on the control panel after all temperature of
each area have reached the setting value and the
adhesive in the tank has been melt completely.
Содержание HS1102S
Страница 1: ......
Страница 23: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 22 ...
Страница 24: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 23 ...
Страница 25: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 24 ...
Страница 26: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 25 ...
Страница 27: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 26 ...
Страница 28: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 27 ...
Страница 29: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 28 ...
Страница 30: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 29 ...
Страница 31: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 30 ...
Страница 32: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 31 ...
Страница 33: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 32 ...
Страница 34: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 33 ...
Страница 35: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 34 ...