10
RD..
and VD..
– Roof fans
Installation and Operating Instructions
COMMISSIONING REPORT
according to DIN EN 60079-17
Please fill in the commissioning report.
The copy remains in this document. Any questions relating to the warranty can be solved only on presentation of the commissioning report!
Installing company:
....................................................................................................................................................
Location/Company headquarters:
....................................................................................................................................................
Tel. / Email:
....................................................................................................................................................
Model/Type:
....................................................................................................................................................
Complete serial number:
(compare type plate on the fan)
....................................................................................................................................................
Date of installation:
....................................................................................................................................................
1. Inspection carried out in accordance with
DIN EN 60079-17:
YES
Controller:
..........................................................................
2. Electrical connection/installation to VDE?
YES
3. Minimum air gap checked?
YES
Value:
..........................................................................
4. Unhindered running of impeller checked?
YES
5. Current consumption measured?
YES
Value:
..........................................................................
(compare with type plate)
6. Airflow direction and direction of rotation checked?
YES
7. Vibration limits checked:
YES
Value:
..........................................................................
8. Equipotential bonding available:
YES
m
The electrical system corresponds to the recognized rules of the electrical engineering and the Ex guidelines! The
technical documents were submitted to the operator. He was familiarized with the safety information, the operation and
maintenance of the fans with present installation and operating instructions!
__________________________________
___________________________________
Place, Date, Signature
Place,
Date,
Signature
Customer/Owner
-
CHAPTER 7
EN
Содержание RDD 200/4 EX
Страница 14: ...12 RD und VD Dachventilatoren Montage und Betriebsvorschrift DE...
Страница 15: ...13 RD und VD Dachventilatoren Montage und Betriebsvorschrift Notizen DE...
Страница 28: ...12 RD and VD Roof fans Installation and Operating Instructions EN...
Страница 29: ...13 RD and VD Roof fans Installation and Operating Instructions Notes EN...
Страница 30: ...14 RD and VD Roof fans Installation and Operating Instructions Notes...
Страница 31: ...15 RD and VD Roof fans Installation and Operating Instructions Notes...