
Tables and Overviews | Functions of the TNC 640 and the iTNC 530 compared
21
HEIDENHAIN | TNC 640 | Conversational Programming User's Manual | 10/2017
939
Function
TNC 640
iTNC 530
Circle programming with polar
coordinates
The incremental rotation angle
IPA
and the direction of rotation
DR
must have the same sign. Other-
wise, an error message will be
issued
The algebraic sign of the direc-
tion of rotation is used if the sign
defined for
DR
differs from the one
defined for
IPA
Tool radius compensation on circular
arc or helix with angular length = 0
The transition between the
adjacent elements of the arc/helix
is generated. Also, the tool axis
motion is executed right before
this transition. If the element is the
first or last element to be correct-
ed, the next or previous element is
dealt with in the same way as the
first or last element to be correct-
ed
The equidistant line of the arc/helix
is used for generating the tool path
Compensation of tool length in the
position display
The values
L
and
DL
from the tool
table and the value
DL
from the
TOOL CALL
block are taken into
account in the position display
The values
L
and
DL
from the tool
table are taken into account in the
position display
SLII Cycles 20 to 24:
Number of definable contour
elements
Max. 16384 blocks in up to 12
subcontours
Max. 8192 contour elements
in up to 12 subcontours, no
restrictions for subcontour
Define the working plane
Tool axis in
TOOL CALL
block
defines the working plane
The axes of the first positioning
block in the first subcontour
define the working plane
Position at end of SL cycle
With the
posAfterContPocket
(no. 201007) parameter, you can
define whether the end position
is above the last programmed
position, or whether the tool
moves to clearance height in
the tool axis
If the tool moves to clearance
height in the tool axis,
both coordinates must be
programmed with the first
traverse movement
With MP7420, you can define
whether the end position is
above the last programmed
position, or whether the tool
moves only to clearance height
in the tool axis
If the tool moves to clearance
height in the tool axis,
one coordinate must be
programmed with the first
traverse movement
Содержание TNC 640
Страница 4: ......
Страница 5: ...Fundamentals ...
Страница 36: ...Contents 36 HEIDENHAIN TNC 640 Conversational Programming User s Manual 10 2017 ...
Страница 67: ...1 First Steps with the TNC 640 ...
Страница 90: ......
Страница 91: ...2 Introduction ...
Страница 130: ......
Страница 131: ...3 Operating the Touchscreen ...
Страница 144: ......
Страница 145: ...4 Fundamentals File Management ...
Страница 206: ......
Страница 207: ...5 Programming Aids ...
Страница 236: ......
Страница 237: ...6 Tools ...
Страница 281: ...7 Programming Contours ...
Страница 333: ...8 Data Transfer from CAD Files ...
Страница 355: ...9 Subprograms and Program Section Repeats ...
Страница 374: ......
Страница 375: ...10 Programming Q Parameters ...
Страница 478: ......
Страница 479: ...11 Miscellaneous Functions ...
Страница 501: ...12 Special Functions ...
Страница 584: ......
Страница 585: ...13 Multiple Axis Machining ...
Страница 650: ......
Страница 651: ...14 Pallet Management ...
Страница 664: ......
Страница 665: ...15 Batch Process Manager ...
Страница 673: ...16 Turning ...
Страница 713: ...17 Manual Operation and Setup ...
Страница 797: ...18 Positioning with Manual Data Input ...
Страница 803: ...19 Test Run and Program Run ...
Страница 843: ...20 MOD Functions ...
Страница 881: ...21 Tables and Overviews ...