Special Functions | Global Program Settings (option 44)
12
HEIDENHAIN | TNC 640 | Conversational Programming User's Manual | 10/2017
529
Control display
Like a shift in the NC program, the
Mirroring (W-CS)
of the
Global Program Settings
function has no effect on the actual
position display.
The general status display shows the following icons:
Mirroring in the NC program active
Mirroring (W-CS)
function active (default icon of the
Global Program Settings
function)
The values
Mirroring (W-CS)
values are displayed on the
GS
tab
of the additional status display, the values from the NC program
on the
TRANS
tab.
Application example
Mirroring the CAM output:
CAM output for right mirror cap
The workpiece datum is centered on the workpiece blank
NC program set to the center of the ball-nose cutter and
TCPM
function with spatial angles
The left mirror cap is to be machined (X axis mirroring)
Open the
Global Program Settings
function
Activate
Mirroring (W-CS)
with marked X
Run the NC program
The control takes the
Mirroring (W-CS)
value for the X axis and
the required rotary axes into account.
Shift (mW-CS)
Refer to your machine manual.
Your machine tool builder can also disable individual
settings possibilities within the
Global Program Settings
function.
The Shift (mW-CS) option of the
Global Program Settings
function
provides a coordinate transformation in the mW-CS (modified
workpiece coordinate system).
The W-CS workpiece coordinate system is modified with active
Shift (W-CS)
or active
Mirroring (W-CS)
. Without this preceding
coordinate transformation, the Shift (mW-CS) option would be
effective directly in the W-CS workpiece coordinate system and
would thus be identical to
Shift (W-CS)
.
"Workpiece coordinate system W-CS",
The Shift (mW-CS) option in the
Global Program Settings
function
takes effect on an axis-by-axis basis. The value is added to the shift
that takes place
before
the machining plane is tilted as defined in
the NC program (e.g. Cycle 7
DATUM SHIFT
), the same way as it is
done for an active
Shift (W-CS)
.
Содержание TNC 640
Страница 4: ......
Страница 5: ...Fundamentals ...
Страница 36: ...Contents 36 HEIDENHAIN TNC 640 Conversational Programming User s Manual 10 2017 ...
Страница 67: ...1 First Steps with the TNC 640 ...
Страница 90: ......
Страница 91: ...2 Introduction ...
Страница 130: ......
Страница 131: ...3 Operating the Touchscreen ...
Страница 144: ......
Страница 145: ...4 Fundamentals File Management ...
Страница 206: ......
Страница 207: ...5 Programming Aids ...
Страница 236: ......
Страница 237: ...6 Tools ...
Страница 281: ...7 Programming Contours ...
Страница 333: ...8 Data Transfer from CAD Files ...
Страница 355: ...9 Subprograms and Program Section Repeats ...
Страница 374: ......
Страница 375: ...10 Programming Q Parameters ...
Страница 478: ......
Страница 479: ...11 Miscellaneous Functions ...
Страница 501: ...12 Special Functions ...
Страница 584: ......
Страница 585: ...13 Multiple Axis Machining ...
Страница 650: ......
Страница 651: ...14 Pallet Management ...
Страница 664: ......
Страница 665: ...15 Batch Process Manager ...
Страница 673: ...16 Turning ...
Страница 713: ...17 Manual Operation and Setup ...
Страница 797: ...18 Positioning with Manual Data Input ...
Страница 803: ...19 Test Run and Program Run ...
Страница 843: ...20 MOD Functions ...
Страница 881: ...21 Tables and Overviews ...