
Information for OEM and Setup users | Commissioning
II
4.6.5
Configuring axes for encoders with TTL interface
Settings
►
Axes
►
<Axis name>
►
Encoder
Parameter
Explanation
Encoder input
Assignment of the encoder input to the axis of the product
Settings:
X21
X22
X23
Interface
Automatically detected
TTL
interface type
Encoder model
Connected encoder model
Settings:
Linear encoder
: Linear axis
Angle encoder
: Rotary axis
Angle encoder as linear encoder
: Rotary axis is displayed as
linear axis
Default value: Depending on the connected encoder
Signal period
For linear encoders
Length of a signal period
The signal period must be calculated:
Interval or grating period / Interpolation = Signal period
Setting range:
0.001 µm ... 1000000.000 µm
Default value:
20.000
Output signals per revolution
For angle encoders and for display of a rotary axis as a linear axis
Number of output signals
Setting range:
1 ... 10000000
Default value:
18000
Teach sequence
Starts the teach sequence for determining the
Output signals per
revolution
for an angle encoder based on a specified angle of
rotation.
Display mode
For angle encoders and for the display of a rotary axis as a linear
axis.
Settings:
–∞ ... ∞
0° ... 360°
-180° ... 180°
Default value:
–∞ ... ∞
Mechanical ratio
For display of a rotary axis as a linear axis:
traverse path in mm per revolution
Setting range:
0.1 mm ... 1000 mm
Default value:
1.0
Reference marks
Configuration of the
Reference marks
"Reference marks (Encoder)", Page 90
Terminating resistor
Dummy load to avoid reflections
Settings:
ON
or
OFF
Default value:
ON
92
HEIDENHAIN | GAGE-CHEK 2000 | Operating Instructions | 06/2022
Содержание GAGE-CHEK 2000
Страница 1: ...GAGE CHEK 2000 Operating Instructions Evaluation Unit English en 06 2022...
Страница 3: ...I General information...
Страница 7: ...1 Fundamentals...
Страница 14: ...2 Safety...
Страница 19: ...3 Basic operation...
Страница 43: ...II Information for OEM and Setup users...
Страница 48: ...1 Transport and storage...
Страница 54: ...2 Mounting...
Страница 60: ...3 Installation...
Страница 72: ...4 Commissioning...
Страница 121: ...5 Setup...
Страница 150: ...6 File management...
Страница 157: ...7 Settings...
Страница 172: ...8 Servicing and maintenance...
Страница 184: ...9 Removal and disposal...
Страница 186: ...10 Specifications...
Страница 194: ......
Страница 195: ...III Information for the Operator user...
Страница 240: ...14 What to do if...