
Information for the Operator user | Sending measured values to a computer
Activating the switching function
You assign digital inputs to specific actions in order to operate remote access via
switching functions.
MVO
Action
Description
Trigger function
The function is executed once.
Start function
The function is started.
Stop function
The function is terminated.
In the
Measured value output
dialog box, swipe across the
touchscreen from right to left
Assign the digital input to the desired function
More than one input is available depending on the
product variant.
Activating
Remote commands
You activate commands in order to operate remote access via remote control
commands. You can use default commands or your own commands.
MVO
Action
Description
Default command
Trigger function
The function is execut-
ed once.
fctStartCmd1
1)
Start function
The function is start-
ed.
fctStartCmd1
1)
Stop function
The function is termi-
nated.
fctStopCmd1
1)
1)
The numbering is incremented sequentially.
In the
Measured value output
dialog box, swipe twice across
the touchscreen from right to left
Tap
Reset all user commands to default values
or
Tap the input field and enter your own command
12.2
Sending measured values to a computer
The
Measured value output
functions allow you to send measured values to a
computer manually or automatically.
Requirement:
Measured value output is configured
"Configuring the measured value output", Page 234
Sending measured values manually
Conduct a measurement
Tap
Manual measured value output
The measured values are sent to the computer once
III
HEIDENHAIN | GAGE-CHEK 2000 | Operating Instructions | 06/2022
237
Содержание GAGE-CHEK 2000
Страница 1: ...GAGE CHEK 2000 Operating Instructions Evaluation Unit English en 06 2022...
Страница 3: ...I General information...
Страница 7: ...1 Fundamentals...
Страница 14: ...2 Safety...
Страница 19: ...3 Basic operation...
Страница 43: ...II Information for OEM and Setup users...
Страница 48: ...1 Transport and storage...
Страница 54: ...2 Mounting...
Страница 60: ...3 Installation...
Страница 72: ...4 Commissioning...
Страница 121: ...5 Setup...
Страница 150: ...6 File management...
Страница 157: ...7 Settings...
Страница 172: ...8 Servicing and maintenance...
Страница 184: ...9 Removal and disposal...
Страница 186: ...10 Specifications...
Страница 194: ......
Страница 195: ...III Information for the Operator user...
Страница 240: ...14 What to do if...