4 Planning and installation – Installing the heating system
38
F
LOOR
CLADDING
6.
Slide the floor cladding (1) on the rails (2) under the boiler until the
cladding is flush with the left and right boiler side.
R
IGHT
HAND
BOILER
CLADDING
7.
Release the the two M6 nuts (SW10) from the stud bolts on the
bottom of the boiler cladding.
8.
Release the remaining M6 nuts (SW10) and the three Phillips-head
screws on top of the boiler cladding.
Figure 4/11 - Installing the floor cladding
1
2
This operating manual describes the boiler version with the door
stop on the right. For the version with the left door stop, reverse the
sides.
9.
Attach the right boiler
cladding (2) using the welded
stud bolts in the oblong holes
in the floor cladding.
10.
Fold the boiler cladding (2)
upwards toward the boiler (1).
Figure 4/12 - Attaching the right hand cladding
1
2
Содержание Turbotec 50 L
Страница 1: ...hdg bavaria com HDG Turbotec with HDG Lambda Control 1 Operation Manual ...
Страница 2: ......
Страница 6: ...6 ...
Страница 10: ...10 ...
Страница 22: ...3 Mode of operation Declaration of conformity 22 3 5 Declaration of conformity ...
Страница 94: ...94 ...
Страница 99: ......