4 Planning and installation – Dimensions
23
4 Planning and installation
4.1 Dimensions
A) Diameter of flue pipe connection 180 mm
B) Length of flue gas fan 230 mm
C) Length of boiler (without fittings) 1,605 mm
D) Length of boiler (incl. fittings) 1,895 mm
E) Length of front cladding 60 mm
F) Height of boiler when filling hatch is open 1,850 mm
G) Width of boiler (incl. cladding) 820 mm
H) Flue pipe connection height 576 mm
I) Return connection height 745 mm
J) Supply connection height 1,220 mm
K) Height of boiler 1,395 mm
Figure 4/1 - Dimensions
B
C
D
A
G
K
F
I
H
E
J
Содержание Turbotec 50 L
Страница 1: ...hdg bavaria com HDG Turbotec with HDG Lambda Control 1 Operation Manual ...
Страница 2: ......
Страница 6: ...6 ...
Страница 10: ...10 ...
Страница 22: ...3 Mode of operation Declaration of conformity 22 3 5 Declaration of conformity ...
Страница 94: ...94 ...
Страница 99: ......