4 Planning and installation – Installing the heating system
37
5.
Place the boiler at the planned location while observing the
minimum clearances.
See section “4.2 Structural requirements”, section “Necessary
room sizes and minimum spacing”.
6.
Align the boiler using plastic plates or flat steel strips (not included
in the scope of delivery) so that it rises 1 to 2 cm toward the
connections.
The boiler has HDG Turbotec been set up.
I
NSTALLING
THE
CLADDINGS
R
EAR
BOILER
CLADDING
1.
Remove the fastening screw
(1) from the plate under the
supply connection using a
Phillips-tip screwdriver.
2.
Remove the filler plug (2)
from the flue connection
using a SW8 spanner.
Figure 4/9 - Back of boiler
1
2
3.
Position the rear boiler
cladding (2) above the flue
connection (3) on the boiler.
4.
Fix the cladding in place with
the fastening screw (1).
5.
Install the filler plug at the
provided location (4) using a
SW8 spanner.
The rear cladding is pre-
attached.
Figure 4/10 - Attaching the rear cladding
1
4
2
3
Содержание Turbotec 50 L
Страница 1: ...hdg bavaria com HDG Turbotec with HDG Lambda Control 1 Operation Manual ...
Страница 2: ......
Страница 6: ...6 ...
Страница 10: ...10 ...
Страница 22: ...3 Mode of operation Declaration of conformity 22 3 5 Declaration of conformity ...
Страница 94: ...94 ...
Страница 99: ......