![HDG Turbotec 50 L Скачать руководство пользователя страница 81](http://html.mh-extra.com/html/hdg/turbotec-50-l/turbotec-50-l_operation-manual_2112431081.webp)
7 Cleaning and maintaining the heating system – Procedure
81
4.
Release the four wing nuts (4) on the cleaning shaft lid (1).
5.
Lift off the cleaning shaft lid (1).
6.
Lift the flue gas deflector plate (2) approx. 10 cm and fix it in place
with the poker (3), or pull the gas deflector plate completely out of
the cleaning shaft.
2.
Pull the plug (1) of the flue gas
fan cable out of the plug
board.
3.
Remove the rear cover (2)
from the boiler.
Figure 7/6 - Dismantling the plug
2
1
Figure 7/7 - Dismantling the cleaning shaft lid
2
1
Figure 7/8 - Cleaning the cleaning shaft
2
3
1
Содержание Turbotec 50 L
Страница 1: ...hdg bavaria com HDG Turbotec with HDG Lambda Control 1 Operation Manual ...
Страница 2: ......
Страница 6: ...6 ...
Страница 10: ...10 ...
Страница 22: ...3 Mode of operation Declaration of conformity 22 3 5 Declaration of conformity ...
Страница 94: ...94 ...
Страница 99: ......