4 Planning and installation – Installing the heating system
39
12.
Open the upper filling hatch (1).
13.
Fasten the right boiler cladding on the spacer plate (3) slightly
with the Phillips-head screws (2).
The right cladding is pre-assembled.
L
EFT
BOILER
CLADDING
14.
Release all pre-attached M6 nuts (SW10) and Phillips-head screws
from the left boiler cladding.
11.
Fasten the right boiler
cladding with the M6 nuts
(SW10) (1) without tightening
them completely.
Figure 4/13 - Fastening the right boiler cladding in place
1
Figure 4/14 - Fastening the cladding to the spacer plate
2
3
1
Caution!
While installing the boiler, make sure the lock striker plate of the
filling hatch or upper filling hatch does not catch on the door
number of the lateral boiler cladding.
The door numbers can only be unlocked in conjunction with the
HDG Lambda Control 1 control.
Содержание Turbotec 50 L
Страница 1: ...hdg bavaria com HDG Turbotec with HDG Lambda Control 1 Operation Manual ...
Страница 2: ......
Страница 6: ...6 ...
Страница 10: ...10 ...
Страница 22: ...3 Mode of operation Declaration of conformity 22 3 5 Declaration of conformity ...
Страница 94: ...94 ...
Страница 99: ......