Tank Drain
Tank Drain
Tank Drain
Tank Drain
Valve
Valve
Valve
Valve
Table 1
Table 1
Table 1
Table 1 Approved Propylene Glycol Vendors
Approved Propylene Glycol Vendors
Approved Propylene Glycol Vendors
Approved Propylene Glycol Vendors
SUPPLIER
PROPYLENE
GLYCOL
PHONE
PRIMARY
Dow Chemical
DowFrost
800-447-4369
ALTERNATES
Houghton Chemical
Safe-T-Therm
800-777-2466
Interstate Chemical Co.
Intercool NFP
800-422-2436
Huntsman Petrochemical
Jeffcool P-155
281-719-6000
Noble Company
NoBurst-100
800-878-5788
Fill Reservoir
1.
Close supply and return side isolation valves.
2.
Locate the fill valve on the side of the glycol reservoir (see Figure 2.11).
3.
Remove protective cap from fill valve and connect hose to the ¾” GHT
connection (as shown in Figure 2.10).
4.
Open the fill valve and fill the tank with glycol solution. The level of glycol
solution in the tank should rise as viewed through the liquid level indicator.
5.
Continue to fill tank until the level of glycol solution has reached the tank full level
Tank Fill Valve
Tank Fill Valve
Tank Fill Valve
Tank Fill Valve
Full Tank
Full Tank
Full Tank
Full Tank
Tank Low
Tank Low
Tank Low
Tank Low
Fill LED will be
Fill LED will be
Fill LED will be
Fill LED will be
on at this level.
on at this level.
on at this level.
on at this level.
Figure 2.11 Glycol Tank Filling
Figure 2.11 Glycol Tank Filling
Figure 2.11 Glycol Tank Filling
Figure 2.11 Glycol Tank Filling