5 - Operation
87
Quick Reference - Cleaning
ATTENTION! Pump speed 560 rpm.
A.
Full agitation.
B.
Spray until air comes out of nozzles. Engage FlexCapacity pump.
When the pressure drops, close the regulation valve by pressing the
button on the SetBox until
yellow LED lights on the valve (this can take up to 10 seconds).
Press “auto” to have the system remove pressure spikes automatically before next start-up.
C.
Minimum 45 seconds with nozzles OFF.
D.
Spray until air comes out of nozzles.
A
1/3
4 x 1/6
4 x 1/6
B
C
D
Содержание COMMANDER 4500
Страница 2: ......
Страница 4: ......
Страница 10: ...Table of Contents 8...
Страница 12: ...1 Welcome 10...
Страница 48: ...3 Description 46...
Страница 96: ...5 Operation 94...
Страница 99: ...6 Maintenance 97 Lubrication and Oiling Plan Boom Width 80 100 10 10 10 C 500 C 50 C 50 10...
Страница 100: ...6 Maintenance 98 Lubrication and Oiling Plan Boom Width 120 10 C 500 C 50 10...
Страница 129: ...6 Maintenance 127 At the same time adjust the two stop bolts to align the boom sections...
Страница 142: ...6 Maintenance 140...
Страница 162: ...8 Technical Specifications 160...
Страница 168: ...Index 166...
Страница 169: ......