10  

Check  the  chain,  the  steel  cable  
wheel  if  their  rotation  are  normal     

Operation  
and  
visual  

Oiling  Lubricating

cleaning

new  

replacement  

11  

Check  up  and  down  movement  of  
two  landslide  is  normal,  comfortable  
and  non-­jitter  

Operation   Foreign   body   cleaning

oiling  

cleaning  

12  

Check  the  action  of  the  four  
insurance  block  if  it’s  normal  and  
comfortable  (with  automatic  insert  
action),  check  the  insurance  steel  
cable  if  it’s  loose  injury     

Operation

visual

listen  

Foreign   body   cleaning

oiling  

cleaning

adjustment   or   new  

replacement     

13  

Whether  it  is  automatically  stopped  
when  no-­load  up  to  the  highest  
location     

Operation   Repair

new  replacement  

14  

Check  power  unit  is  working  properly  
without  abnormal  noise  

Operation

listen  

Repair

new  replacement  

15  

Inspect  tanks,  oil  hoses  and  
connecting  joints  is  normal  no  
leakage     

Operation

visual  

Repair

new  replacement  

6.   

Packing,  transport  and  storage

      

Only  skilled  personnel  who  are  familiar  with  the  lift  and  this  manual  shall  be  allowed  to       
carry  out  packing,  lifting,  handling,  transport  and  unpacking  operations.  
  
90%   of  components  were  pre-­assembled  and  packed  with  blister  packing  in  steel  frame  
for  shipment.  Power  unit  was  packed  together   with   the   lift,   and   power   unit   stand   was  
packed  and  fixed  on  above  lifts.                                                                       
  
Lifting  and  handling.  When  loading/unloading  or  transporting  the  equipment  to  the  site,be  
sure  to  use  suitable  loading  (e.g.  cranes,trucks)  and  hoisting  means.  Be  sure  also  
to  hoist  and  transport  the  components  securely  so  that  they  cannot  drop,  taking  into  
consideration  of  the  package’s  size,  weight  and  centre  of  gravity  and  its  fragile  parts.      
  
Storage  and  stacking  of  packaged  lifts.     
Packaged  lifts  must  be  stored  in  a  covered  place,  out  of  direct  sunlight  and  at  a  
temperature  between-­10°C  and  +40°C.    

Delivery  and  check  of  packages.  When  the  lift  is  delivered,  check  for  possible  damages  
due  to  transport  and  storage;;  verify  whether  the  points  are  included  which  is  specified     
in  the  manufacturer’s  confirmation  of  order.  In  case  of  damage  in  transit,  the  customer     
must  immediately  inform  the  carrier  of  the  problem.  Packages  must  be  opened  carefully,  
not  to  cause  damage  to  people  (keep  a  safe  distance  when  opening  straps)  and  parts  of     
the  lift  (be  careful  the  objects  do  not  drop  from  the  package  when  opening).    

   

Содержание Happ25

Страница 1: ...Four post lift Happ25 4 post hoist Happ25 four post parking lift INSTRUCTION MANUAL...

Страница 2: ...delivery vehicle 14 Unpack all loose fitting items 15 Remove runways 15 Construct and attach end frames 16 Connect the cables 17 Install the pump assembly 18 Securing with anchor bolts 19 Initial Tes...

Страница 3: ...eptable to remove this strap or modify it ensure the plate clears Raincoat studs There are some mushroom shaped studs on the edge of the runway we have never supplied the raincoat that is available to...

Страница 4: ...r operate if it malfunctions or if it has broken or damaged parts Repairs should be made with original equipment parts 1 1 Cautions with words Pay special attention to the parts connected with product...

Страница 5: ...nage carefully understand and remember them Routine maintenance and inspection is necessary for safe lift operation Read operating and instruction manuals before operating lift Remain clear of lift wh...

Страница 6: ...nnel Do not operate damaged lift Do not exceed lifting capacity Avoid excessive rocking of vehicle while on lift 1 3 Usage Purpose The lift is used for parking cars whose weight is less than 4000kg Ro...

Страница 7: ...debris Before lowering lift be sure tool trays stands etc are removed from under your vehicle Release locking devices before attempting to lower lift l Adequate ventilation should be provided when wo...

Страница 8: ...THE LIFT MANUFACTURER S MANUAL Improper installation can cause accelerated wear resulting in catastrophic failure such as property damage and body injury Manufacturer will assume no liability for los...

Страница 9: ...f a fault or defect we must supply pictures and text You must send pictures and details to us to receive warranty components Parts are sent to HAPP for verification of fault and subsequent exchange re...

Страница 10: ...rocedures Ensure any maintenance and repairs have been completed and signed off Equipment Check All fittings for tightness Anchor bolts are tight Foundations are visibly sound Safety release mechanism...

Страница 11: ...ed on all columns Maintenance Follow the HAPP user guides for regular planned maintenance Ensure checks by competent persons are performed at regular intervals or in the event of any accidental damage...

Страница 12: ...Main Parts of the Lift The four post parking lift is the more convenient lift for parking the vehicle The following words will help you understand the working principle of the device before using Plea...

Страница 13: ...estionable slope consider a survey of the site and the possibility of pouring a new level concrete slab This lift is designed to be installed on a minimum of 180mm thick 3500psi steel reinforced concr...

Страница 14: ...on with pictures is provided in section 11 The first few sections are similar so don t give up review all of the sections It is recommended you read both sections which will give you two descriptions...

Страница 15: ...the hose directly from the pump to the cylinder without going through the hole in the runway and fit it after you have raised the runway and located it on the safety latch Figure hose fitting which ma...

Страница 16: ...he entry end and two smaller plates that are used at the entrance end as shown below Ensure that the head of the bolt is on the inside of the cross beam where the cables run Failure to do so may cause...

Страница 17: ...n extended and should now be able to be routed through the pulleys and up into the cap assembly External lock The cable routes up to the top plate on the column You will put a washer then two nuts on...

Страница 18: ...wires for an optional limit switch Refer to electrical system section for details these connections are to be made by a licensed electrician to a 15Amp circuit Remove the generic fitting and replace w...

Страница 19: ...ust the column vertical positioning with shims under the base plate These location of the columns needs to be verified before drilling holes the column vertical alignment can be performed after this s...

Страница 20: ...and double check safety mechanism is functional Make sure you have even lifting on all four cables small differences in adjustment may cause the plate connecting cables to cylinder rod to not be hori...

Страница 21: ...se Test the latch operation by lifting and checking all latches release and engage at the same time If they are not engaging the cause will likely be either the lifting cable adjustment or the latch a...

Страница 22: ...power unit to lower the lift Watch the runways at each end in case any of the latches have not disengaged likely due to incorrect adjustment of cables or latches Lifting higher may correct the proble...

Страница 23: ...g handling transport and unpacking operations 90 of components were pre assembled and packed with blister packing in steel frame for shipment Power unit was packed together with the lift and power uni...

Страница 24: ...to oil container Noise is too loud when the lift is working The sliding and rotational part lack lubrication and or change the pulleysl Add dry lubrication change the pulleys The lift can t rise a The...

Страница 25: ...t Happ25 4 post hoist 25 8 Hydraulic diagram Item Name Item Name Item Name 1 cylinder 4 Overflow valve 7 Gear pump 2 One way overflow valve 5 Unloading valve 8 Adjustable throttling valve 3 One way va...

Страница 26: ...Four post parking lift Happ25 4 post hoist 26 8 Exploded Diagram...

Страница 27: ...al system The figure below illustrates the electrical connections for the control unit on the electric motor Figure Electrical schematic for HAPP motors Some HAPP motors are supplied with an additiona...

Страница 28: ...ide wiring of single phase motor These wires map out to a white connector as shown below Figure Electrical connection to motor This white connector is used to attach an limit switch to the hoist In ca...

Страница 29: ...The limit switch connector should be connected and either shielded with extra insulation double insulated or moved back inside the control box If the limit switch is operational a 4Amp fusible link mu...

Страница 30: ...dle on the power unit to lower the lift The small allen key in the center of one side of the unit is used to adjust the lowering speed The other flat head adjuster under the plastic cover on other sid...

Страница 31: ...ge to protect items should they fall out Unpack all loose fitting items The hoist is packed with the runways and end frames forming the package frame Carefully remove the items within the package bein...

Страница 32: ...Cylinder preparation The cylinder as supplied is in the fully raised position ram tube inside the cylinder When you assemble and attach the steel cable you will need to extend the ram tube to provide...

Страница 33: ...lumns then install the locking ladder The locking ladder will slot into the crossbeam nylon sliders as shown below The nylon slider will be inside the column at the base of the column at this stage Th...

Страница 34: ...configure the safety release mechanism The two ends of the rod are threaded together with the threaded rod and lock nut as shown in the diagram below 7 Place the two runways onto the end frames Typic...

Страница 35: ...lates are placed at the opposite end to entry location on the hoist The half size plates are placed on the entrance end of the hoist allowing runways to be fitted and overrun plate to be added when in...

Страница 36: ...ct location The columns are placed in the desired location Measure the gap between the columns to confirm the spacing is correct This measurement is a guide to locating the column the columns must be...

Страница 37: ...25 has extra bracing under the runway which makes this step harder than usual You will have installed some of rods earlier in readiness for this step Install the rods into the runway as shown connect...

Страница 38: ...tight cables are routed correctly locks are operational and hydraulic lines are connected 11 Fill the pump assembly oil reservoir with oil the hoist should be filled with 10Litres of ISO 46 grade hydr...

Страница 39: ...ift Happ25 4 post hoist 39 12 Have an electrician connect the pump motor to a 15AMP circuit of or power outlet as described in this manual 13 Install drip trays and parts tray 14 The hoist is now read...

Страница 40: ...extra adjustment 5 With the runways lifting evenly the lock engagement can be adjusted After the latchs pass the latch point you will hear the four clicks lower the hoist slowly and see that all latc...

Страница 41: ...replaced after the vehicle is safely on the hoist Moveable hoist configuration If the dolly wheel option has been purchased these units can be installed at any time by assembling the caster wheel to...

Страница 42: ...dures for any equipment are the responsibility of the owner of the hoist Lift installation and operating conditions can significantly impact the effective operating capability of any hoist It is the o...

Отзывы: